Close to Beauconsfield suburban train station, KF Contruction inc. proposes a project of urban requalification which allowed the development of the site by constructions of buildings in height. Eventually more than 150 units in four building will be built in the heart of a landscaped courtyard.
The mandate of Paré + was to carry out the following analyzes and interventions:
Collaboration overall layout plan
Circulation study
Memory
Zoning change request
Follow up with the city